There are 27,190 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Cambodia
|
Biodiversity
|
2024
|
49,900.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: No. LVG/2024-01 |
|
|
Moldova
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MDA/SGP/OP7/Y4/CORE/BD/2023/56 |
The Sipoteni commune, located on the international route Chisinau-Ungheni, is the largest rural locality in the C?l?ra?i district (approximately 7300 people) with increased natural, cultural, and agricultural potential.
On the territory of the ( ... )
ni commune, there are approx. 1200ha of forests located in the pavilions of the village, including those with the status of protected natural monuments. The village is surrounded by four forests: 3 deciduous and one pine forest. In 2021, the authority of the commune received as a donation land with an area of 0.0737 ha. This ground belonged to two men from Sipoteni with property rights on it. The
|
|
Nigeria
|
Climate Change Mitigation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CC/24/19 |
|
|
Moldova
|
Biodiversity
|
2024
|
34,500.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MDA/SGP/OP7/Y4/CORE/BD/2023/58 |
Restoring degraded land in Moldova's rural landscapes is an important issue, as it can have a significant impact on the environment and on the sustainability of rural communities.
The creation of river protection zones and strips in Moldova is an ( ... )
ant aspect of water resource management and environmental protection. These buffer strips are essential for maintaining water quality, preserving aquatic and terrestrial ecosystems, and preventing flooding. Their creation process involves several steps and requires proper regulation, monitoring and management.
The project "Promotion and implementation of nature-based solutions for the
|
|
Nigeria
|
Climate Change Mitigation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CC/24/34 |
|
|
Tanzania
|
Biodiversity
|
2024
|
49,593.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/05 |
Promoting Climate Smart Agriculture and Environmental Livelihood Options in Esilalei Village for Conservation of Kwakuchinja Corridor Environment and Biodiversity Ecosystem |
|
Nigeria
|
Chemicals
|
2024
|
45,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CH/24/31 |
|
|
Nigeria
|
Climate Change Mitigation
|
2024
|
35,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CC/24/20 |
|
|
India
|
Land Degradation
|
2024
|
48,286.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: IND/SGP/OP7/Y4/CORE/LD/2023/26 |
The project addresses critical environmental and developmental challenges while emphasizing gender inclusivity.
Rationale: The selected project areas in East Khasi Hills District face environmental degradation and poverty, necessitating ( ... )
nable solutions
Objectives:
1. As the target clusters are very prone to soil erosion due to the hilly terrain compounded by torrential rain received due to their location in the region receiving the heaviest rainfall on earth, the project aims at mitigation of land degradation through soil formation and retention by adoption of Integrated natural farming systems and subsequent restoration of
|
|
Guyana
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: GUY/SGP/OP7/Y4/CORE/BD/2024/01 |
|
|
Ghana
|
Biodiversity
|
2024
|
30,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: GHA/COMDEKS-4/2024/03 |
Primary objective:
The Primary objective of this project is to contribute to the resilience of Weto as a socio-ecological landscape through active participation of communities in the sustainable management and utilization of biodiversity for ( ... )
sed production and wealth creation. This will be done through the promotion of medicinal plant gardens and cultivation as tools for biodiversity conservation and livelihood enhancement in twelve (12) communities from two(2) traditional areas CRMCs (Holuta and Kpoeta) within the Zio-Tordzie CREMA.
Project results:
? Project Result 1: 30 herbalists in Zio-Tordzie CREMA acquired improved
|
|
Kazakhstan
|
Climate Change Mitigation
|
2024
|
43,889.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: KAZ/SGP/OP7/Y1/STAR/CC/24/14 |
|
|
Nigeria
|
Climate Change Mitigation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CC/24/24 |
|
|
Nigeria
|
Chemicals
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CH/24/25 |
|
|
Bhutan
|
Community Based Adaptation
|
2024
|
42,550.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: BHU/CBA 3/2024/01 |
Athang is one of the remotest and most isolated Gewog in Wangdue Phodrang with challenging terrain, marked by poor communication and limited accessibility. Spanning 746 sq kms, the Gewog has five chiwogs, 26 villages, and 198 households with a human ( ... )
ion of 793 people. The area is renowned for its unique product, Nya Dosem, a specially prepared smoked fish crafted using traditional methods. Historically reliant on fishing in the Hara Chhu River for both sustenance and income, the community faced challenges from illegal fishing practices. In response, the Harachhu Capture Fishery Management Group (HCFMG) was formed in 2010.
The pressing
|
|
Tunisia
|
Biodiversity
|
2024
|
45,454.55
|
OP7 Y4 (July 23-June 24)
|
Project Number: TUN/SGP/OP7/Y4/STAR/CC/2023/03 |
|
|
Congo, dem. republic
|
Climate Change Mitigation
|
2024
|
25,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: DRC/SGP/OP7/Y4/CORE/IP/2023/1 |
Ce projet est une réponse à la problématique de manque d?énergie électrique dans les milieux PA, particulièrement dans le village Bokatola Londje. Les populations ont fait le choix d?utiliser l?énergie solaire aussi bien pour éclairer leur ( ... )
e que pour la cuisson propre au sein des ménages. Le projet touchera 196 bénéficiaires autochtones, dont 27 hommes, 32 femmes et 136 enfants de ce village.
|
|
Congo, dem. republic
|
Climate Change Mitigation
|
2024
|
25,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: DRC/SGP/OP7/Y4/CORE/IP/2023/3 |
Le projet vise à garantir l'accès des peuples autochtones les PA du village Tshintu Mwanza à l'énergie renouvelable et à contribuer à réduire la pression sur les forêts. Trente (30) ménages sélectionnés du village seront les ( ... )
ficiaires de ce projet.
Le projet compte installer l?éclairage public grâce aux lampadaires publics connectés et distribuer des kits solaires aux 30 ménages autochtones pré identifiés.
|
|
Tanzania
|
Biodiversity
|
2024
|
37,411.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/16 |
Problem Statement
The main problem to be addressed by this project is the increased mangrove forests loss in the Rufiji Delta since the early 1980s to now. The drivers of both, global and national environmental degradation are directly linked ( ... )
ustainable production practices ? primarily in agriculture, fisheries, and forestry ? that result is species and habitat loss, as well as the massive or progressive destruction of woody biomass for land clearance or fuel.
Background of poverty, force communities to illegally cut mangrove forests for timber business, poles for buildings and rice farms expansion. Rice farmers enjoy the natural
|
|
Argentina
|
CapDev
|
2024
|
11,214.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: ARG/SGP/OP7/Y5/CORE/2024/01 |
|
|