There are 27,190 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Nigeria
|
CapDev
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/MULTI/24/15 |
|
|
Dominica
|
Climate Change Mitigation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: DMA/SGP/OP7/Y4/CORE/CC/2024/05 |
. Project name: Supporting Kalinago Women in Turmeric Production and Processing to build resilience and enhance livelihoods
Project Number: DMA/SGP/OP7/Y4/CORE/CC/2024/05 Applicant: Kalinago women Upliftment Group
Overall objective / ( ... )
ties to be implemented under the grant: To create jobs for Kalinago Women.
Objectives: 1. To reduce leaching of chemicals. 2. To reduce soil erosion 3. To reduce the number of chronic non communicable diseases in indigenous population 4. To use minimal tillage allowing preservation of soil especially on slopes
Activities: a). Building / Upgrading facility dedicated to processing. b).
|
|
Viet nam
|
Biodiversity
|
2024
|
5,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VNM/COMDEKS-4/2024/03/p |
|
|
Viet nam
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VNM/SGP/OP7/Y4/CORE/2024/01 |
|
|
Kiribati
|
Community Based Adaptation
|
2024
|
49,900.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: KIR/CBA 3/2023/03 |
Climate change has affected the ground water for St. Eritabeta community turning it into a brackish water which is not ideal and safe for drinking. The community had been residing on a brackish water for such a long time and the access to the ( ... )
le freshwater has been a long issue for villagers.
The ground wells in this section were brackish and unsafe for drinking, however, toward the center of the island the fresh water lens is abundance and a source of potable water for affected households but they have to manual carry the heavy water buckets daily some 100 meters distance for the closest households.
The objective of the project
|
|
Lao
|
Community Based Adaptation Community Based Adaptation Community Based Adaptation
|
2024
|
16,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: LAO/SGP/CBA3/2023/113 |
Savannakhet Province is one of the most affected area in country in year 2018 and 2019 from severe flooding, especially in agricultural sector. Nongdern village, Songkhone district is one of the affected area which is lost 100% of rice paddy, the ( ... )
damages and losses is irrigation system that has been affected severely as results of flood that caused by extreme climate change. Therefore, the villagers cannot practicing rice cultivation in the rainy season as frequent flood. Hence, irrigation would be the best way for them to produce rice. At present, villagers just utilize the temporary irrigation which is insufficient for households.
|
|
Eritrea
|
Land Degradation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ERI/SGP/OP7/Y4/STAR/LD/2024/19 |
|
|
Vanuatu
|
Land Degradation
|
2024
|
13,750.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VUT/SGP/OP7/CORE/LD/23/10 |
The lowland areas are fertile and had been modified to large agricultural land mainly cattle and coconuts plantations. Small gardening holding in farming food crops can be use in management of invasive plant species in reducing their spreading, ( ... )
e smart farming to reduce soil loss to erosion. Empowering and engaging youth in small gardening holding can be a catalyst to recover land productivity and supporting ecosystem restoration, and secure food. The project to make access water through solar pump for crops gardening irrigation and provide knowledge and upskilled local youths in climate Smart
|
|
Tanzania
|
Biodiversity
|
2024
|
46,268.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/04 |
Context:
Kitendeni is among the corridor that has been identified as a major threat to the protected areas viability and sustainability in a block of northern Tanzania wildlife corridors. However, in West Kilimanjaro ecosystem is the only remained ( ... )
or that links Kilimanjaro and the other ecosystems after blockage of the former corridors to Tsavo West National Park, Arusha National Park, Meru Forest, Mkomazi Game Reserve. The corridor allows wild animals movement (ibid) to Kilimanjaro National Park and Amboseli National Park in Kenya.
This proposed initiative on sustainable conservation of Irkwasa and Kitendeni villages? environment will
|
|
Nigeria
|
Climate Change Mitigation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CC/24/36 |
|
|
Tanzania
|
Biodiversity
|
2024
|
27,978.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/29 |
|
|
Tanzania
|
International Waters
|
2024
|
31,975.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/28 |
|
|
Botswana
|
Land Degradation
|
2024
|
49,177.92
|
OP7 Y6 (July 25-June 26)
|
Project Number: BOT/SGP/OP7/Y4/CORE/GGW/2023/02 |
Context: Kweneng District, situated within the heart of Botswana, represents a region of notable ecological diversity and cultural significance. Despite its distinct attributes, Kweneng grapples with a complex spectrum of environmental challenges, ( ... )
particularly urgent concern surrounding land degradation and unsustainable forest utilization especially harvest of wild fruits. These environmental issues require immediate attention and comprehensive intervention to safeguard the district's ecological equilibrium, resilience to climate change, and the socio-economic well-being of its communities. In particular, the concern is the conservation
|
|
Mozambique
|
Biodiversity
|
2024
|
30,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: MOZ/SGP/OP7/Y4/CORE/GGW/2024/03 |
|
|
Tanzania
|
Land Degradation
|
2024
|
50,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: TAN/SGP/OP7/Y5/CORE/GGW/2024/01 |
|
|
Nepal
|
Biodiversity
|
2024
|
45,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y4/CORE/BIA/2024/03 |
The project aims to develop a community Beekeeping Project which included conservation of indigenous bees, sustainable beekeeping and honey harvesting and impact on community livelihood and biodiversity. |
|
South africa
|
Land Degradation
|
2024
|
37,500.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: SAF/SGP/OP7/Y4/CORE/GGW/2024/04 |
|
|
Egypt
|
Climate Change Mitigation
|
2024
|
50,000.00
|
OP7 - Y1 (Jul 20-Jun 21)
|
Project Number: EGY/SGP/OP7/Y1/CC/2023/14 |
to reduce the effects of climate change and provide opportunities for practicing sports and community activities within environmentally friendly & green youth centers, through developing four youth centers in four neighborhoods/areas in greatest ( ... )
n three governorates, aiming to implement models of sustainable local youth centers.
The project primarily aims to achieve the principles of sustainable development, mitigate the impacts of climate change, and promote gender equality and equal opportunities for youth and children to engage in sports and community activities within environmentally friendly youth centers. This is to be realized
|
|
Egypt
|
Chemicals
|
2024
|
25,853.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: EGY/SGP/OP7/Y2/POPs/2024/24 |
|
|
Lesotho
|
Land Degradation
|
2024
|
30,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: LSO/SGP/OP7/Y4/CORE/GGW/2024/03 |
|
|